What to expect

You keep your workflow, your tests and your Playwright config as they are. Boba gets you results sooner and posts one check on your pull request.

How long a run takes

On your first run, Boba takes about as long as your CI does now. On every push after that, Boba gets to your tests faster.

If Boba finds a secret your job left behind, it posts a second check, Boba setup, that says where and how to fix it, and Boba runs your next push like a first run.

Standard and Turbo

TierPick it forPrice
StandardThe lowest price per run$0.001 per vCPU-minute
TurboThe fastest result$0.0015 per vCPU-minute

Each price covers the whole job: the runner and every fork. Boba uses Standard until you turn Turbo on in the Boba step:

      - uses: coldteadotai/boba@v1
        with:
          turbo: true

The check on your pull request

Boba posts one check on the commit, named Boba unless you set check-name. On a pull request it posts the same summary as a comment.

  • Boba annotates each failing test on the line that failed and groups failures by cause.
  • Boba marks a test that already fails on your default branch, so it doesn't read as broken by your change. When every failure also fails there, Boba ends the check neutral: Nothing broken by this PR
  • On a pull request, Boba stops at the first test that still fails after its retries, and the check says how many tests didn't run. Set fail-fast: false to run them all. On pushes and merge queues Boba always runs the whole suite.
  • When a check fails, Boba adds a prompt you can paste into your coding agent to fix it.

In a workflow with several Boba jobs, Boba posts a check per job, named Boba / <job name>, plus one for the whole run, such as All 3 Boba jobs passed

The report

Open Full report in the check to see your Playwright report with traces. Anyone with the link can open a public repository's report. For a private repository, you sign in with GitHub, and Boba opens the report if you can read the repository. Boba deletes reports 90 days after the job.

Limits

  • Boba stops a job after 60 minutes. Split a longer suite into several Boba jobs.
  • When your other jobs are running or Boba is busy, Boba holds the job and the check says Waiting for your other jobs or Waiting for a machine. Boba starts it as soon as it can, with nothing for you to do.

If a check says something went wrong, look up its title in Troubleshooting.